Valar Atomics

Valuation tripled to ~$6B at the Aug 2026 Series B. NOTE: a previous uncited entry here recorded a $450M Series B at $2.0B in Apr 2026. The August reporting puts total raised at ~$1.13B including a prior $130M round backed by Palmer Luckey and Shyam Sankar, which leaves no room for it — it appears to have been a garbled version of that earlier round, and was removed under the sourcing rules.

LeadershipIsaiah Taylor
OwnershipPrivate
Valuation~$6B
Latest roundSeries B (Aug '26)
Raised$1B Series B (Aug '26); ~$1.13B total, plus a $200M credit facility
Top investorsSequoia Capital (lead), Riot Ventures, Point72 Ventures, Conviction, Snowpoint Ventures, Apandion, Dream Ventures, HOF Capital; earlier round backed by Palmer Luckey and Shyam Sankar

The program

The machines being built, in order, and what each one proves.

1
NOVA CoreCore testOptional stepcomplete · 17-Nov-25

Core-only critical experiment at LANL/NNSA National Criticality Experiments Research Center (NCERC), Nevada — 17 Nov 2025. An assembly modeling a SUBSECTION of the Ward-250 core, not the whole core and not inside the machine. Week-long campaign: 10 critical configurations, 26 subcritical tests, ~100 GB of data, foil activation and helium-3 detector readings used to validate neutronics codes and control-rod worth. An OPTIONAL de-risking step, not a required rung — most developers skip it.

2
Ward-250Democomplete · 18-Jun-26

First criticality 18 Jun 2026.

3
Ward-TBDDemoplanned

Valar’s next machine and their commercial-scale demonstration — a demo at commercial scale rather than the commercial product, the same shape as Aalo-X. Which design it uses has not been decided: Valar holds designs for both a 5 MWe and a 25 MWe Ward, so this entry deliberately does not pick one. It has to close everything Ward-250 left open: a full fuel load, full power, and the commercial power conversion.

Designs

3 in the tracker

DesignStageTypeCoolantMWeSiteCriticalityOpen in
Ward-250DemoHTGRHelium5San Rafael Energy Lab18-Jun-26CriticalityTimelineBuildoutAnatomy
Ward 5MWeCommercialHTGRHelium5Site TBDTarget - 2028TimelineLCOEDesign spaceAnatomy
Ward 25MWeCommercialHTGRHelium25Site TBDPendingAnatomy

Manufacturing

1 facility

Factory production (announced)Reactor lineannounced
Stated capacitynot published

Valar raised a $1B Series B led by Sequoia in Aug 2026 explicitly to move from demonstration to factory production. No facility location, floor area or annual throughput has been published yet.

Order book

2 deals · 9,675 MWe announced · 30 MWe firm

CustomerSiteDesignUnitsMWeFirm MWeCommitment
NvidiaSan Rafael Energy Research CenterWard 25MWe37530binding
Project Beehive (no offtaker named)Project BeehiveWard 25MWe4569600—none

Latest

8 tracked events