NRC track — figures provisional
1 in the tracker
| Design | Stage | Type | Coolant | MWe | Site | Criticality | Open in |
|---|---|---|---|---|---|---|---|
| SMR-300 | Commercial | PWR | Water | 300 | Palisades Site | Target - 2030 | TimelineBuildoutDesign spaceAnatomy |
1 facility
SMR-300 major structures, systems and components are manufactured by Holtec's own US production fleet — a vertically integrated supply chain rather than an outsourced one. Current strategy supports a baseline of two SMR-300 units a year; further expansion is envisaged through the planned Holtec Heavy Industries facility. CAPACITY IS NOT DEMONSTRATED: this is what Holtec says its current strategy supports, not output it has achieved — no SMR-300 has been built, the Palisades construction permit having only been docketed in Feb 2026. The campus itself is long operating, for casks and other nuclear equipment.
1 deal · 600 MWe announced · 0 MWe firm
| Customer | Site | Design | Units | MWe | Firm MWe | Commitment |
|---|---|---|---|---|---|---|
| Holtec / Palisades | Covert | SMR-300 | 2 | 600 | — | none |
Nothing tracked yet.